Play sand for a 6 m² sandpit
A family garden sandpit built directly on cleared ground: 6 m² zone, 15 cm fill depth, washed play sand at 1500 kg/m³, 5% waste for spillage while filling, no compaction and no moisture adjustment since the bagged play sand is delivered dry.
Raw volume = 6 × 0.15 = 0.9 m³. With 5% waste and 0% compaction: 0.9 × 1.05 = 0.945 m³. Weight = 0.945 × 1500 = 1417.5 kg. Bags (25 kg each): ceil(1417.5 ÷ 25) = 57 bags.
0.9 m³ is the theoretical fill volume, 0.945 m³ is the quantity after waste, and 57 bags is the final purchase figure. No compaction was added because loose play sand in a sandpit is not tamped like a bedding layer.
⚠ 1500 kg/m³ and a 15 cm fill depth are editable examples — always check the density stated on the play sand product's packaging and choose a depth that suits the age of the children using it, since deeper fills are often recommended for younger children.
Bedding sand for a 15 m² block-paved patio
A block-paved patio: 15 m² zone, 3 cm screeded bedding layer, sharp bedding sand at 1650 kg/m³, 5% waste, 5% compaction because the sand will settle slightly once the pavers are tamped in, and 3% moisture because the delivered sand is not bone dry.
Raw volume = 15 × 0.03 = 0.45 m³. With 5% waste and 5% compaction: 0.45 × 1.05 × 1.05 = 0.496 m³. Weight = 0.496 × 1650 × 1.03 ≈ 843 kg. Bags (25 kg): ceil(843 ÷ 25) = 34 bags. Bulk: max(1.0, ceil(843 ÷ 100) ÷ 10) = 1.0 t.
0.45 m³ is the theoretical bedding volume at the target depth; 0.496 m³ is the loose volume to order once waste and compaction are added; 843 kg is the moisture-adjusted weight. The 1.0 t bulk figure is higher than the 0.843 t the weight alone implies, because it is raised to the supplier's 1 t minimum delivery load.
⚠ The 3 cm depth is an average — an unevenly prepared sub-base or warped pavers can locally need a noticeably thicker bedding layer, so screed and check level carefully before assuming the calculated quantity will be enough.
Building sand bulk delivery vs. bags for a masonry project
A masonry project needing 2 m³ of soft building sand for mortar mixing, stockpiled loose rather than screeded: 10% waste for mixing spillage, no compaction since it is not tamped, 4% moisture because the load arrives slightly damp. Bags cost 5.50 per 25 kg bag; bulk sand costs 62 per tonne plus a 45 delivery fee, with a 1 t supplier minimum.
Raw volume = 2 m³ (already summed from the measured zones). With 10% waste and 0% compaction: 2 × 1.10 = 2.2 m³. Weight = 2.2 × 1650 × 1.04 ≈ 3775 kg. Bags: ceil(3775 ÷ 25) = 151 bags → 151 × 5.50 = 830.50. Bulk: max(1.0, ceil(3775 ÷ 100) ÷ 10) = 3.8 t → 3.8 × 62 + 45 = 280.60.
Buying 151 bags would cost about 830.50, while a 3.8 t bulk delivery including the flat delivery fee costs about 280.60 — bulk is clearly cheaper once the quantity comfortably clears the supplier's 1 t minimum. The calculator surfaces both totals so the choice is based on cost rather than habit.
⚠ Changing the selected currency only changes the displayed symbol — it does not convert 5.50, 62 or 45 into a different currency's equivalent value. Enter current local supplier prices in the currency you have selected, and confirm sales tax and any delivery surcharge separately.